FINISH

FINISH

Gypsum putty FINISH 

RANGE OF APPLICATION: The mixture is intended for leveling vertical and horizontal concrete, foam concrete, cement, cement-lime, gypsum and gypsum plasterboard surfaces for painting and wallpapering. It can be used for sealing joints between gypsum plasterboard and gypsum fibrous sheets using reinforcing tape (calico strip) and as a repair compound for quickly eliminating small chips, cracks up to 15 mm deep. For internal work in dry rooms.

PREPARATION OF PRIMARY STRUCTURE: The temperature of the primary structure and environment must be within the range from + 5 to + 30° C. The primary structure must be strong, thoroughly cleaned of dust, dirt, oils, fats, residues of loose paint and other substances that can weaken adhesion of the putty coat to the primary structure. Uneven or highly absorbent substrates should be pre-treated with a deep penetration primer. 

PREPARATION OF MORTAR: 

To prepare FINISH solution, you must:

1. Take a precisely measured quantity (7 liters per 10 kg.)

2. Pour the mixture into water;

3. Stir with a construction mixer or drill with a special nozzle until a homogeneous mass is obtained;

4. To make a technological pause of 5-10 minutes for maturing the solution.

5. Stir the solution repeatedly.

After that, the putty is ready for use within 60 minutes. with periodic stirring.

OPERATIONAL PROCEDURE:

The putty is applied to the primary structure using a smooth steel spatula. To smooth out small areas, a spatula with the width of 30 cm is used. A permissible thickness of one layer with continuous filler is not more than 3 mm, with partial leveling and sealing of irregularities - not more than 15 mm. If it is necessary to apply a thicker layer, the solution is applied in several approaches with the time intervals necessary for hardening of the previous layer. Drying out time of the putty layer is from 5 to 9 hours (depending on thickness of its application, temperature and humidity). After drying, the surface is grinded using a thin polishing sheet or sanding mesh. Sealing joints of gypsum plasterboard. The first basic layer of putty is applied to the joint, into which the reinforcing tape (calico strip) is put in. A wide putty knife is applied to the coating layer of putty. After drying, the surface is grinded with a thin abrasive paper. Uncured material is washed off the tools with water; hardened material is mechanically cleaned. Attention! Water after cleaning the tool cannot be used to prepare the putty.

OCCUPATIONAL SAFETY: To prevent skin irritation, avoid contact with exposed areas of the body. In case of contact with eyes, rinse immediately with water and consult a doctor if necessary. In addition to the above information, you should be guided by the safety instructions in construction.

WARRANTY AND STORAGE: Warranty period of storage in intact original packaging is 6 months from the date of manufacture. Shelf life is 12 months. Store in dry rooms, excluding ingress of moisture on bags with dry mix. Transportation of products should be carried out under conditions ensuring safety of packaging and protection against moisture. Instructions for use are recommendatory in nature and do not replace professional training of a contractor. If the instructions and recommendations for storage and use are not followed, the manufacturer is not responsible for quality of the work.

SPECIFICATIONS: 

Color: white to light beige

Maximum grain size: 0.18 mm.

Solution lifetime: at least 1 hour.

Drying out time: at least 1 hour.

Application layer thickness: up to 3 mm.

Consumption per m² with a layer thickness of 1 mm.: 1 kg.

Adhesion: 0.6 MPa.

Work temperature: from +5°С to +30°С.

Operating temperature: from +5°С to +50°С.